01/08/2013
Today we have first meeting with our supervisor (Dr Luke)
to discuss about project detail. Before we construct this meeting, we
have choose the topic about mall management system which is software
base.
The main thing we have talk about on this meeting is what is our idea on the mall management system. Dr Luke ask us a lot of question and share his idea with us to let know have more clear vision about the mall management system.
Dr Luke
advised us about have a clear interview with some of the mall which
available in Wollongong city to gather information about the mall
management system.
In this meeting, I'm understand
about the mall management system is mainly use to manage "MALL" and not
really use to be the business side. And one main point Dr Luke
point out is advertisement availability spot can be put inside the mall
management system to help the shop keeper promote their product.
Besides that, Dr Luke
also talk about the first presentation which held on week 6 and the
requirement of the presentation. This presentation basically talk about
the main and clear vision of the mall management system and have to
present to other people which can understand the main idea on this
project. We have to provide detail such as what the product does, design
methodology, deployment environment and etc. Dr Luke also remain
us about this presentation is just about 5 min present and 5 min
question and answer section. He ask us have to put in the clear
information and do not waste time to put in unnecessary information to
slide.
One more thing is we better have 1 presenter on
that time rather than all of us to present because changing of person to
present is waste of time.
06/08/2013
Have some
review article about what is the methodologies going to use in our final
year project. Find some of the information about RUP and prototype
methodology. I find out that prototype will be suitable for our project
because we must have high level of communication with our client before
we start our project. I need to fully understand about what is the needs
of client to develop our project.
11/08/2013
Our
leader, Tan Yenn Yenn have create blog for us to upload our material
and send me the link 3 days ago. Review on the blog and think some of
the idea to decorate project blog. Write down the idea and ready to
perform on next meeting.
13/08/2013
Do
some review on QT creator (understand how it works) and also know QT
actually is some kind of library which compatible IDE Netbean 7.3
version. Find out QT creator have problem on create the table (which
work in IDE Netbean 7.3) and have to further test on this software.
19/08/2013
Meeting
yesterday very success with Google Hangout. We have discuss some of the
requirement of the project and when we going to start our project slide
which have to present on week 7.
24/08/2013
Meeting
on today to prepare the presentation slide together in Google Doc.
Slide have been created and come out with all the information we have to
put into our presentation.
04/09/2013
Re-read all the and upload it once together.
05/09/2013
Presentation on today and show current stage of work to our super visor.
07/09/2013
Meeting on today and our project manager have give some work for me to prepare next documentation.
12/09/2013
Prepare for Final Documentation before hand out to Supervisor. Project Manager request me and Matthew to double check everything before we pass to her. Arrange all the document and prepare well.
18/09/2013
Arrange all diary and ask idea on how to prepare individual diary from Project Manager.
21/09/2013
Project Manager start arrange next documentation : Preliminary Document. Ask Project Manager what i have to do. Used around 3 hour to get all the info.
22/09/2013
Draw some Class Diagram and Use-Case Diagram. Discuss Idea with Matthew.
24/09/2013
Draw another few Class Diagram and Use-Case Diagram. Discuss Idea with Matthew.
25/09/2013
Hand up diagram to Project Manager.
28/09/2013
Edit some error on Use-Case Scenario.
05/10/2013
Project Manager Arrange some task for me to start Preliminary Documentation. I will need to prepare Activity Diagram.
07/10/2013
Draw some Activity Diagram. Discuss Idea with Matthew
08/10/2013
Draw some Activity Diagram. Discuss Idea with Matthew
09/10/2013
Hand up All Diagram We have done all Activity Diagram and let Project Manager check correctness.
16/10/2013
Edit some error point out by Project Manager. Edit all the Activity Diagram and check their error.
19/10/2013
Finalize all Activity Diagram before pass to Project Manager.
23/10/2013
Start Technical Report with all the correct Diagram. Ask Idea how to start this report from Project Manager.
26/10/2013
Do some part of Technical Report. Add in all Activity Diagram and Sequence Diagram.
30/10/2013
Have error on arrangement of all Diagram. Project Manager request to re-arrange all from top to bottom.
01/11/2013
Finalized Technical Report and send to Project Manager to check the correctness of it.
No comments:
Post a Comment