04/03/2014
Communicated with the group and split up the work into two main parts. The web interface will be done by Yenn and I, the database programming will be done by Joshua, Chew and Matthew. meeting went for 1.5hrs.
07/03/2014
Looked for into hosting a website with my computer and also checked the investigated for ad-free host sites. Researched for 3hrs.
11/03/2014
Discussed with the group on the cons and pros of hosting a website ourselves or using a free host site. After much debate decided on the free host site. Meeting went for 3hrs.
14/03/2014
I found a great host site with no advertisements and good tools. Uploaded the webpage to the site and gave the link to the others. Took 5hrs to find the suitable host site.
20/03/2014
Updated the website and fixed errors in some of the webpages took 4hrs.
24/03/2014
Went through the comments/feedback/complaints form took 4hrs and was confused on whether I should put it into a php page and let the program grab and put it into the database or somehow directly send it to the database itself.
27/03/2014
Discussed this with the group during a group meeting and they decided that it would be best to directly send the form to the database. I told them I have no experience and knowledge with database but they still wanted it done in this fashion. Meeting went for 1.5hrs.
01/04/2014
Researching and studying on making a form connect to database using php. Went through a lot of dead-ends but found a tutorial site that looks promising. Took about 6hrs going through the research and studying.
08/04/2014
Been incredibly busy with other assessment(and still am busy) and neglected my research. Briefly studied (1hr) the database again.
15/04/2014
Added the linked between the feedback/compliant and database for the website and the program. Took a 4 hrs to test everything was working as it should and to implement the database table
18/04/2014
Added the validation for the feedback and compliant section in case the user submits the form empty. Took 3hrs to figure out how to do that and to test that everything was working as it should
23/04/2014
Working on the installation guide for the program. Had to install MySQL, apache and the program from the beginning. Took 4hrs and had some problems in the installation will continue later.
27/04/2014
Worked more on the installation guide and finally finished it took me 5hrs to take all the screenshots and edit them.
02/05/2014
Group started to concentrate on the prototype demonstration. We had to show a working prototype that covered most of the high priority requirements. We discussed the schedule and started to work on it. Meeting went for 3hrs.
10/05/2014
Spent 4 hours finalising the prototype for the prototype presentation. We make sure all high and core requirement was done, fix error in connecting to database because each team member upload different database which cause query error when executing function which involves the database and look into our group website design.
16/05/2014
A fair few errors cropped up during the presentation we listed them all down. Also discussed changing to MySQL since the assessor recommended it to us instead of using SQlite. Took 3-5hrs to go over the errors.
20/05/2014
Switched to MySQL, lots of error cropped up again since the database had changed but noticed the ease of access there was in using MySQL. Took 3hrs to switch over.
23/05/2014
Looked through the code with team members, we knew we had to get rid of some minor requirements but thankfully the core and high were almost finished. Took 3hrs.
02/06/2014
Had a group meeting we went through the any last minute adjustment we had to do to the program, documentation and the website. We took 2-3hrs going through the list.
03/06/2014
Worked on the User Manual by going through teamviewer to access Josh computer to get the right data for the documentation took 3-4hrs
04/06/2014
Problem arouse, the teamviewer wasn't working suspect there was some connection trouble. Tried to install the program but had a major problem with MySQL. Took most of the day to fix the problem 6-8hrs:(
05/06/2014
Finished the User Manual took 3hrs to double check and finialise it. Uploaded it to google drive so it can be added to final documentation